CSI Engineering, Inc. was the prime contractor on an ongoing WMATA A&E IDIQ Facilities SBE Contract. MECH-001- Sewage Ejector Replacement – Phase A, CSIE provided engineering services for the replacement of ten sewage ejector systems at ten different stations within the WMATA transit system. These systems include mechanical pumps, control panels, power, communications, and structural aspects. Project locations were evaluated to identify efficient and maintainable systems and technology for individual site conditions. All designs were accomplished with close coordination with WMATA plant personnel in order to provide a sustainable and maintainable system into the future.
WMATA Metro Stations – Ten New Sewage Ejector Designs
10 WMATA Metro Stations - New Sewage Ejector Designs
Overview
Project Highlights:
Location: Ten underground stations throughout the Metro System
Size: Varied by location
Key Project Elements
- CSIE provided multi-disciplined engineering design services under our Prime GAEC SBE IDIQ contract
- Existing Sewage Ejector Systems need frequent service to maintain a healthy environment
- Produced reliable designs for bidding to remove existing sewage ejectors from Metrorail stations and the holistic installation of new sewage ejector systems that best meet the unique needs of each location