CSIE was part of a large project team charged with upgrading an existing Allegheny County Sanitary Authority (ALCOSAN) facility. CSIE was responsible for producing the electrical lighting construction documents for the Odor Control Building, Pipe Galleries, and the Main Pumping Station. The design was completed in late 2020, and will be bid in early 2021.
ALCOSAN New East Headworks Facility
ALCOSAN New East Headworks Facility
Overview
Project Highlights:
Location: Pittsburgh, PA
Size: 20,000 sq ft over several building
Key Project Elements
- CSIE provided engineering consulting service under the direction of Whitman Requardt & Associates (WRA), the Architect and Engineers of Record
- All construction drawings were produced in Revit per ALCOSAN’s requirements
- CSIE provided both electrical and telecommunication design services